Dedicated Data Centers Powered by Dedicated MicrogridBuild-to-Suit Capacities from 50 MW – 500 MW. Microgrid-powered, with 99.999% up-time. Move-in dates starting in Q1/2027.Step 1 of 250%What is your day-one critical load capacity requirement in MW?(Required)What is your total critical load capacity requirement in MW?(Required)What is the anticipated data center use-case (e.g., retail colocation, wholesale colocation, SAS, IAAS, PAAS, AI, HPC, etc.)?(Required)What will be the average workload deployment density requirement as MW/RLU (Rack Location Unit of ~4’ x 2')?(Required)Do you have a standard data center facility infrastructure design?(Required) Yes NoDo you require non-IT floor space for staging, offices, conference facilities, NOC, SOC, etc.? If so, please provide details of your requirements.(Required)Name(Required) First Last Company Name(Required)Email(Required) Δ